Done Project



img01

Design of unloading stracture for open top high sided freight wagons in Bandar Abbas

The project inspired by a structure made in Germany began to design of unloading stracture for open top high sided freight wagons in Bandar Abbas EPC project into action.Now unloading capacity structure of 30 wagons per day in one shift that this amount be increased to 90 cars per day.